Buffalo Trace WWTP Distillery
Industrial | Infrastructure, Water Resource
Industrial
Infrastructure, Water Resource
Project Overview
The project involved constructing a 1.25 MGD wastewater treatment facility to support Buffalo Trace Distillery’s expansion, featuring a biothane aerobic reactor system, a new process and administration building, and full integration of mechanical and treatment systems. Built within an active distillery with limited site space, the team overcame logistical challenges through off-site staging and just-in-time material deliveries while maintaining uninterrupted 24/7 operations by carefully coordinating tie-ins without disrupting production. Despite beginning construction at only 30% design completion and accommodating $3 million in added scope, the project was delivered on schedule through close collaboration among multiple design and construction partners. Baker self-performed major scopes, including demolition, piping, equipment installation, and system startup, ensuring quality, efficiency, and greater control throughout the project.
Client
Buffalo Trace Distillery
Location
Frankfort, KY
Size
1.25 MGD
Completion
September 2023